Exxon Mobil
-
This project for Exxon Mobil's corporate headquarters in the Woodlands, Texas, consisted of 20 buildings with over 3.5M sq ft of office space.
Teknion provided a full Altos demountable wall solution with over 25 miles of product. The solution was maximized for reconfigurability and the entire project consisted of just 4 panel sizes for complete modularity.
-
Altos | Only 4 panel sizes
-
Location: Woodlands, TX
Project Size: 3.5M SF / 130K LF
Completion Date: 2016 to Present
Final Construction Cost: Undisclosed
-
Dealer: JCS/Workplace Solutions
Architect: PDR
Contractor: Harvey
Reference:
Melissa Mack, MBA
Project Manager
Jones Lang LaSalle (JLL)
P: 832.624.3926
American Airlines
-
The new American Airlines headquarters in Fort Worth, TX is a 100% open plan environment. Teknion’s Altos & Optos demountable walls were used throughout Skyview 7, Skyview 8 and the amenities buildings to create the enclosed focus, meeting, huddle and conference areas. Teknion created a customized tech panel that housed room signage as well as room schedulers. An ADA ledge was also created to meet ADA requirements on the TV walls in various conference settings.
-
-
Location: Fort Worth, TX
Project Size: 1.7M SF. 16K LF
Completion Date: 2019
Final Construction Cost: $350 M+
-
Dealer: Workplace Solutions
Architect: Gensler
Contractor: StructureTone
Walmart HQ
-
The new, 350-acre campus is designed with a focus on sustainability, utilizing mass timber construction. The project consisted of 12 buildings with over 2.4M sq ft of office and amenity space.Teknion provided a full Altos demountable wall solution. The solution was maximized for reconfigurability and the entire project consisted of minimal panel widths for complete modularity.The new headquarters is an open plan environment. Teknion’s Altos demountable system was used to create the enclosed focus, meeting, huddle and conference areas. Teknion created a customized tech panel that housed room signage as well as room schedulers.
-
-
Location: Bentonville, AR
Project Size: 2.4M SF. 45K LF
Completion Date: 2026
Final Construction Cost: $1B
-
Dealer: Workplace Solutions
Architect: Gensler
Contractor: StructureTone, Shawmut
Undisclosed Tech Company
-
This was a 100% custom solution for this customer. Every component had to reflect the design methodology and quality that this customer holds themselves to. The integrated design of walls and furniture (Teknion Demountable Walls + Height-Adjustable Tables) had to have the ability to adjust and adapt to 52 differing functional workflows. When it came to installation, there were 3,000 trades on-site working around us.
We applied our can-do, will-do attitude to make the situation viable. A cohesive team from manufacturing to installers was able to flex and adjust our schedule to suit the client’s ever-shifting construction schedule.
-
Custom Demountable Solution
-
Project Size: 2.8M SF
Completion Date: 2018
Final Construction Cost: $80 M+
-
Dealer: The Collective
Architect: Foster + Partners
Contractor: Holder Construction
CIBC
-
Provision for demountable wall systems, plus furniture for offices, meeting spaces, open area workspaces, and collaborative zones. LEED building standards, WELL certified – Teknion provided detailed information and reports based on the requirements. In addition to providing standard products, Teknion, CIBC, and the design firm worked collaboratively to customize product details to fit unique client functional needs. This involved a comprehensive refresh of furniture and space standards, incorporating new ways to work in a more collaborative and WELL-focused environment.
Teknion’s site delivery team consisted of 3 autonomous delivery teams plus a ‘floater’ team to maximize the installation of each floorplate. Managing the production—from raw material stockpiling through to efficient truckload deliveries to site—were all key practices to deliver this project.
-
-
Location: Toronto, Ontario
Project Size:
Tower 1 – 24 floors of corporate office, 4 floors of retail bankingTower 2 – 19 floors of corporate office
Completion Date:
Tower 1 – 2021
Tower 2 – January 2026Final Construction Cost:
Overall project cost of $26 million, with a walls component of $5 million -
Dealer: Holmes and Brakel
Architect: Gensler
Contractor: EllisDon, Govan Brown
Ontario Teachers’ Pension Plan (OTPP)
-
Ontario Teachers' Pension Plan's (OTPP) relocation to a modern, dynamic workspace at 160 Front Street, designed to embody their "Teachers 3.0" vision. Teknion supported this major transition by providing the flexible, innovative furniture solutions necessary to bring this technology-enabled environment to life. By outfitting diverse areas—from collaborative meeting hubs and ergonomic workstations to community-centric spaces like the Chef's Harvest café—Teknion helped OTPP create an adaptable workplace that prioritizes employee choice, well-being, and seamless connection.
-
Tek Pier, Tek Room, Tek Work, Tek Booth, Focus,
Tek Vue -
Location: Toronto, ON
Project Size:
Demountable Walls (12 Floors):
Focus walls – 2,852 linear foot
Tek Vue walls - 680 linear foot
Post and beam – 1,800 linear foot
Infill walls under post and beam – 500 linear foot
16 Tek Room Booths
1 Tek Work Booth
24 Tek BoothsCompletion Date: July 2024
Final Construction Cost: $10M
-
Dealer: The Collective
Architect: Gensler
Rogers
-
Teknion partners with Rogers across Canada, furnishing over 500,000 square feet of space with over 4,000 workstations, meeting rooms, libraries, collaborative spaces and cafes.
Teknion also partnered with Rogers, on their Workplace Transformation program, a multi-year journey to modernize their offices across the country. Looking to reinvent their workplace, it was vital to imbed Rogers’ ethos as a forward-thinking company that fosters collaboration, connection and community. In shifting to an activity-based working model, Teknion supported Rogers in creating workspaces that support any type of work individuals need to perform today and tomorrow.
-
Full suite of furniture solutions. Since the time of this case study, Teknion has also supplied Rogers with our Focus architectural walls for executive meeting rooms
-
Location: Toronto, ON
Project Size: Locations across Canada, including:
Toronto, ON, Kelowna, BC, Montreal, QC, Moncton, NB
In total, more than 500,000 square feet of space.Completion Date: Toronto: 2020, Kelowna: 2020, Montreal: 2022, Moncton: 2023
Final Construction Cost: Undisclosed
Dealer: The Collective
-
Dealer: JCS/Workplace Solutions
Architect: PDR
Contractor: Harvey
Reference:
Melissa Mack, MBA
Project Manager
Jones Lang LaSalle (JLL)
P: 832.624.3926
Koch Industries
-
Koch Industries set out to begin replacing all the two existing wall products that they had over to Teknion. Teknion and WPS have worked closely with Koch’s preferred General Contractors to help them obtain Teknion Certified installation training so that the installations can be managed in house. Teknion continues to monitor both G.C.’s as they complete various installations on the road to become formally Altos Certified Installers.
-
-
Location: Wichita, KS
Project Size: *200K SF / 3500 LF
*(most recent Building)Completion Date: 2014 – Present
Final Construction Cost: On-going
-
Dealer: Workplace Solutions
Architect: HKS (Interiors)
Contractor: Eby Construction & Dondlinger Construction
Reference: